Owner: Red Rock Disposal LLC
Year completed: 2017
Services performed:
- Subgrade Prep for Cover Installation: 801,500 SF
- Geosynthetic Rain and Wind Defender Cover System: 801,500 SF
- Excavation and Backfill of Perimeter Cover Tie Ins: 3,945 LF
- Leachate Toe Drain: 2,200 LF