Baxter Johnson Contracting - Grading Contractors in Raleigh, NC

Selected Projects

Baxter Johnson Contracting is a site development company based in Raleigh, North Carolina. Our comprehensive services include preconstruction planning, site development, excavation and grading, stormwater & environmental services, underground utility installation, and concrete and asphalt services.

CPRT

5401 Development

We mass graded a 60 acre commercial development in Raleigh and installed streets and utilities for a new apartment complex.Read More

CPRT

5401 North Development Complex

We performed mass grading on the site and constructed permanent ponds, underground water/sewer/storm utilities, asphalt roadways, and parking lots.Read More

Royal Oaks

Bedford at Flowers Subdivision

We performed turnkey site work for a 63 lot new residential subdivision in Clayton.Read More

Bent Tree

We performed drone surveying, rock blasting, mass grading, railroad boring, constructed two permanent ponds, installed underground water/sewer/storm utilities, widened multiple roads, installed new asphalt residential streets, and strengthened roadways with cement-stabilized stone. Read More

Campbell University of Medicine

Campbell University School of Medicine

Construction of the second largest medical school in the state at Campbell University in Buies Creek.Read More

NC State University

Carol Poole Clubhouse

Performed turnkey site development for new Carol Poole Clubhouse for the Lonnie Poole Golf Course.Read More

TA Loving

East College Park

We performed clearing, erosion control, and lot grading for a new City of Raleigh and HUD home development in downtown Raleigh.Read More

Republic Services

East Wake Transfer Station

Performed stormwater, erosion control, and parking improvements at transfer station facilities in Raleigh, NC.Read More

Hawtree

We used our drone surveying and field tracking software to stay on top of the massive scope of this project.Read More

High Point C&D Landfill – Phase 3B

We installed #57 stone wrapped in geotextile fabric, a geosynthetic clay liner, and a protective soil layer to create a newly proposed underdrain system in the existing stream bed. Read More

Capital Associates

Leith American Stream Crossing

Driveway construction and wetland/stream crossing.Read More

Meredith College

Meredith College

Performed turnkey site development for new on-campus student apartments at Meredith College. Read More

PC Construction

Neuse Wastewater Treatment Plant Phase 4

We performed erosion control and mass excavation and backfill for the phase 4 expansion.Read More

Republic Services

Pamlico County Transfer Station

Performed stormwater, erosion control, and parking improvements at transfer station facilities in New Bern, NC.Read More

Red Rock Disposal Landfill

We provided site grading and installed a geosynthetic cover over a completed portion of an existing cell.Read More

South Wake MSW Landfill

We provided liner installation, gas well installation, leachate drain and pump construction. Read More