South Wake MSW Landfill
We provided liner installation, gas well installation, leachate drain and pump construction.
We provided liner installation, gas well installation, leachate drain and pump construction.
We provided site grading and installed a geosynthetic cover over a completed portion of an existing cell.
We installed #57 stone wrapped in geotextile fabric, a geosynthetic clay liner, and a protective soil layer to create a
We used our drone surveying and field tracking software to stay on top of the massive scope of this project.
We performed erosion control and mass excavation and backfill for the phase 4 expansion.
Performed stormwater, erosion control, and parking improvements at transfer station facilities in New Bern, NC.
Performed stormwater, erosion control, and parking improvements at transfer station facilities in Raleigh, NC.